Achievements

That make us proud!


Mackenzie Bridge - Ontario

2010

Project Details:
The Mackenzie bridge repair was done using precasted and prestressed deck panels. V-ROD fiberglassreinforcing bars were used to provided a corrosion resistant structure and V-ROD prestrassing carbon rods were used with Fiberloc prestressing accessories to better control the cracking of concrete and reduce maintenance cost to a minimum.

See the ''Project Report''
 
  • Overview of both structures after completion
  • Placing the precast panels
  • Placing the precast panels 2