Addington Avenue Bridge - Ontario

2010

Project Details:
Pultrall supplied V-ROD® on rehabilitation of Addington Ave in the City of Toronto due to corrosion of existing structure. V-ROD® GFRP was used in new deck overlay, approach slabs, sidewalks and parapet walls. Bottom layer of deck used some #6 (19m) bar spaced at 150mm while main reinforcing was #5 (16m) spaced at 300mm. Lightpole base also had some #5 and #6 bar with custom bends and ties. V-ROD® used mainly for non-corrosive properties.

See the ''Project Report''
 
  • Top layer of reinforcement.
  • Sidewalk and barrier wall with V-ROD
  • V-ROD installation in the sidewalk