Achievements

That make us proud!


Eglinton Crosstown LRT - Ontatio

2012

Project Details:
Pultrall supplied V-ROD® GFRP in caisson cages in a “softeye” tunneling application at the first launch site for the TBM’s in the $8.2 billion Eglinton Crosstown Light Rail Transit project. V-ROD® GFRP reinforcement used in this specific tunneling application where TBM’s can <a href=''http://liaise.co.uk/shop-fifa-coins.php''>Fut 15 coins</a><a href=''http://harrisonfamilymedicine.com/shop-fifa-coins.php''>Fut coins</a><a href=''http://falmouthtaxis.co.uk/qw8-fifa-coins.php''>cheap fifa coins</a>bore through “Soft-eye” areas of caisson reinforcement cages. V-ROD® GFRP rebar used to reinforce 11.8m long GFRP cages (diameters of of cage was 1100mm). Highest grade 60GPa 25m vertical bars and 15m braces used along with #4(13m) 50GPa circular ties.

See the ''Project Report''
 
  • GFRP cage inside the lining
  • Pre-tying of the GFRP cage on site
  • Lowering the GFRP cage in the lining