That make us proud!

Eglinton Crosstown LRT - Ontatio


Project Details:
Pultrall supplied V-ROD® GFRP in caisson cages in a “softeye” tunneling application at the first launch site for the TBM’s in the $8.2 billion Eglinton Crosstown Light Rail Transit project. V-ROD® GFRP reinforcement used in this specific tunneling application where TBM’s can <a href=''''>Fut 15 coins</a><a href=''''>Fut coins</a><a href=''''>cheap fifa coins</a>bore through “Soft-eye” areas of caisson reinforcement cages. V-ROD® GFRP rebar used to reinforce 11.8m long GFRP cages (diameters of of cage was 1100mm). Highest grade 60GPa 25m vertical bars and 15m braces used along with #4(13m) 50GPa circular ties.

See the ''Project Report''
  • GFRP cage inside the lining
  • Pre-tying of the GFRP cage on site
  • Lowering the GFRP cage in the lining